4D BIM adds an extra dimension of information to a project information model in the form of scheduling data. This data is added to components which will build in detail as the project progresses. This information can be used to obtain accurate programme information and visualizations showing how your project will develop sequentially.
Time-related information for a particular element might include information on lead time, how long it takes to install/construct, the time needed to become operational/harden/cure, the sequence in which components should be installed, and dependencies on other areas of the project.
With time information federated in the shared information model planners should be able to develop an accurate project programme. With the data linked to the graphical representation of components/systems it becomes easy to understand and query project information and it is also possible to show how construction will develop, sequentially, over time showing how a structure will visually appear at each stage.
Working in this way is enormously helpful when it comes to planning work to ensure it is safely, logically and efficiently sequenced. Being able to prototype how assets come together before ground is broken on site allows for feedback at an early stage and avoids wasteful and costly on-site design co-ordination and rework. Showing how projects will be constructed visually is also handy when engaging with stakeholders, giving everyone a clear visual understanding of planned works and what the finished construction will look like with no surprises.
Adding sequencing information can be extremely useful, not just in the design phase, but earlier too, allowing for the feasibility of schemes to be assessed from the off. At tender stage this kind of information can allow initial concepts to be explored and communicated to inspire confidence in the team’s ability to meet the brief.
5D BIM (COST ESTIMATION)
Drawing on the components of the information model being able to extract accurate cost information is what’s at the heart of 5D BIM.
Considerations might include capital costs (the costs of purchasing and installing a component), its associated running costs and the cost of renewal/replacement down the line. These calculations can be made on the basis of the data and associated information linked to particular components within the graphical model. This information allows cost managers to easily extrapolate the quantities of a given component on a project, applying rates to those quantities, thereby reaching an overall cost for the development.
The benefits of a costing approach linked to a model include the ability to easily see costs in 3D form, get notifications when changes are made, and the automatic counting of components/systems attached to a project. However, it’s not just cost managers who stand to benefit from considering cost as part of your BIM process. Assuming the presence of 4D programme data and a clear understanding of the value of a contract, you can easily track predicted and actual spend over the course of a project. This allows for regular cost reporting and budgeting to ensure efficiencies are realized and the project itself stays within budget tolerances.
An information model is likely to contain three types of quantity. Quantities based on actual model components (with visible details) which you can explore through the model are the most obvious. Quantities may also be derived from model components (such as mouldings around windows) that aren’t always visible. The third kind of quantity is non-modelled quantities (these include temporary works, construction joints etc.). Unless the construction phase is modelled then the design model will show, graphically, design quantities but not the construction quantities. Our cost engineers are skilled in picking up the quantities that aren’t solely based on model components.